Work performed included rock blasting 267,000 cubic yards on site, rock crushing 186,000 cubic yards, 326,000 cubic yards of bulk cut to fill, 13, 850 square feet of double wall retaining wall system, 33,642 square feet of versa–lok wall retaining system, 5,000 linear feet of 12” water main, 8,2000 linear feet of s torm sewers, 10,2226 cubic yards of lean concrete replacement, two cast in place bridge of Mashantucket Creek, one 50 feet high abutment of Mashantucket Creek for future use, 61,000 square yards of asphalt paving.
Name and Address of Owner
The Mashantucket Pequot Tribal Nation
39 Norwich Westerly Road
Mashantucket, CT 06338